The latest NFPA 1851 edition states that advanced inspections of all protective ensemble elements be conducted at a minimum of every 12 months, or whenever routine inspections indicate that a problem could exist.
Advanced Inspections must be conducted by the manufacturer, a manufacturer trained organization, or a verified ISP. Complete documentation of all advanced inspections will be kept on file by SoCal PPE for the life of the garment.
With hydrotest liner inspection, documented records of service and complete advanced inspection, we will have you covered and protected.